Scheduling

Turning nominated volumes into the schedule used for delivery and imbalance.

TradingDesk explanationOperations · Scheduling2026-09-10

Scheduling

Scheduling turns accepted nominations, ALPEX results and internal plans into the hourly schedule compared with meters. The official clocks sit with OST and ALPEX.

Source: OST / ALPEX / ERE · 2008-10-24

scheduling · nomination · BRP · imbalance

Read more
Official rule/sourceOperations · Scheduling2008-10-24

Transmission Code (ERE 123/24.10.2008)

ERE Transmission Grid Code for OST planning, operation, connection and dispatch. Official Albanian text, approved 24 October 2008. This is the grid code, not the ALPEX rulebook.

Source: ERE · 2008-10-24

ERE · OST · transmission · grid code

Read more
TradingDesk explanationOperations · Scheduling2026-09-10

Grid connection

A site needs a connection point on the transmission or distribution system before it can be metered, nominated or settled. Official texts are the 2008 Transmission and Distribution Codes.

Source: ERE / OST / OSSH · 2008-10-24

connection · OST · OSSH · metering

Read more