Scheduling
Turning nominated volumes into the schedule used for delivery and imbalance.
Scheduling
Scheduling turns accepted nominations, ALPEX results and internal plans into the hourly schedule compared with meters. The official clocks sit with OST and ALPEX.
Source: OST / ALPEX / ERE · 2008-10-24
scheduling · nomination · BRP · imbalance
Read moreTransmission Code (ERE 123/24.10.2008)
ERE Transmission Grid Code for OST planning, operation, connection and dispatch. Official Albanian text, approved 24 October 2008. This is the grid code, not the ALPEX rulebook.
Source: ERE · 2008-10-24
ERE · OST · transmission · grid code
Read moreGrid connection
A site needs a connection point on the transmission or distribution system before it can be metered, nominated or settled. Official texts are the 2008 Transmission and Distribution Codes.
Source: ERE / OST / OSSH · 2008-10-24
connection · OST · OSSH · metering