Transmission Code (ERE 123/24.10.2008)
ERE Transmission Grid Code for OST planning, operation, connection and dispatch. Official Albanian text, approved 24 October 2008. This is the grid code, not the ALPEX rulebook.
- Official source
- Kodi i Rrjetit të Transmetimit
- Source language
- Albanian
- TradingDesk explanation
- English
Why it matters
OST uses this code to plan and run the transmission system. A nomination still has to fit a connection point, a dispatch plan and a secure grid.
It is not ALPEX and it is not the balancing rulebook. It sits underneath both.
How it works
Official source: the attached PDF, approved by ERE Board Decision No. 123, 24.10.2008. TradingDesk explanation: the file is the transmission grid code for OST and users of the transmission system.
Interesting topics in the file: OST duties, planning, operation and dispatch, connection, scheduling, ancillary services and a short market-operation chapter. Clause-level numbers stay in the PDF.
The file is from 2008, under the older sector law. Law 43/2015 and Law 59/2026 came later. Check a newer ERE act before treating a 2008 step as live.
Key rules / parameters
| Item | Detail |
|---|---|
| Official source | Kodi i Rrjetit të Transmetimit, Vendim ERE nr. 123, 24.10.2008 |
| Operator | OST |
| Not | Not ALPEX market rules and not the balancing rulebook |
| /docs/Kodi_i_Transmetimit_vendim_nr.123_date_24.10.2008.pdf |
TradingDesk context
Keep next to Scheduling. If a plant sits on the transmission system, this code is the grid layer under the nomination.
- Source authority
- Source: ERE
- Publication date
- 2008-10-24
- Official title
- Kodi i Rrjetit të Transmetimit, Vendim i Bordit të ERE-s nr. 123, datë 24.10.2008
- Source language
- Albanian
- Last updated
- 2026-09-10
- Official source
Kodi_i_Transmetimit_vendim_nr.123_date_24.10.2008.pdf
Download official PDF
ERE · OST · transmission · grid code