MIE Instruction 3/20.06.2019, self-producers

Ministry instruction on the simplified authorisation for connecting small solar self-producer projects to the distribution system. Official Albanian text. Read it next to Law 24/2023, because later law may have changed parts of this 2019 procedure.

Official source
Udhëzim nr. 3, datë 20.6.2019, për vetëprodhuesit e energjisë elektrike nga dielli (i përditësuar)
Source language
Albanian
TradingDesk explanation
English

Why it matters

This is the local procedure text for households and small businesses that install rooftop solar for their own use. It sits closer to a prosumer than an ALPEX trader.

It was issued under the older renewable-energy law (7/2017). Law 24/2023 and Law 59/2026 came later. Use the PDF for the 2019 wording. Check whether a newer instruction or ERE act has replaced a step before you treat a number as current.

How it works

Official source: the attached Albanian instruction. TradingDesk explanation: the file is about connection and self-consumption, not about day-ahead trading on ALPEX.

Topics to read in the PDF: who may install (household or SME), the 500 kWp cap as written in 2019, placement on the consumer’s site, monthly net balance and billing by the distribution company, surplus energy, and the application / commissioning papers sent to the DSO.

Those figures and clocks are in the official text. This page does not copy them as live rules.

Key rules / parameters

ItemDetail
IssuerMinistry of Infrastructure and Energy
Number and dateUdhëzim nr. 3 / 20.6.2019
Parent at the timeLigji nr. 7/2017 (later replaced in the stack by Ligji nr. 24/2023)
PDF/docs/Udhezim%20per%20veteprodhuesit%20e%20energjise%20elektrike%20i%20perditesuar-2019-06-20-3.pdf
Check firstWhether a later law, ERE decision or new instruction amended this procedure

TradingDesk context

Use this next to the sign-up text for small businesses and prosumers. A self-producer still has a meter and a bill. A TradingDesk user who later becomes a market participant still needs a BRP and, if they trade, ALPEX access.

Source authority
Source: Ministry of Infrastructure and Energy
Publication date
2019-06-20
Official title
Udhëzim nr. 3, datë 20.6.2019, procedura e lehtësuar e autorizimit për lidhjen në sistemin e shpërndarjes të projekteve të vogla të rinovueshme për vetëprodhuesit e energjisë elektrike nga dielli
Source language
Albanian
Last updated
2026-09-10